Edenbridge Leisure Centre

When Sevenoaks District Council took over the management of Edenbridge Leisure Centre in January 2001, after it had been under private management for 5 years, they were shocked to find that the air handling plant had fallen into disrepair due to a lack of maintenance. The problem was so acute that a decision was taken to replace the unit.

The main problem facing the council was that access to the plant room was limited. So when Recotherm advised that their state of the art fresh air ventilation unit could be constructed on-site they were delighted. The whole project took 9 days to complete including removing the existing heat pump unit and modifying the ductwork to suit the new unit. Peter Kemp of Sevenoaks District Council commented that the unit had dramatically improved the internal conditions in the pool hall.

Project:
Edenbridge Leisure Centre

Reason for Change:
Disrepair

Existing Unit:
Heat Pump

Replacement Unit:
VF200

Pool

Size of Pool:
50 m²

Pool Volume:
N/A

Pool Water Temperature:
N/A

Spa

Spa Volume:
N/A

Spa Temperature:
N/A

Pool Hall

Pool Hall Volume:
N/A

Pool Hall Temperature:
N/A

Consultation

Consultant:
N/A

Unit:
N/A

Air Volume:
N/A

Maximum Dehum:
N/A

Date of Installation:
1988

Programme of Works

Remove Old Unit:
2 Days days

Install New Unit:
4 Days days

Modify Ductwork:
3 Days days

Total Installation Time:
9 Days days