Project: Barrhead Sports Centre
Size of Pool: 396 m 2
Existing Unit: Heat Pump
Date of Installation: 1985
Reason for Change: Internal Corrosion
Replacement Unit: CVF 400
   
Programme of Works:
Remove old unit: 1 week
Install new unit: 1 week
Modify ductwork: 1 week
   
Total Installation Time: 3 weeks

RECOTHERM LTD

1437 Pershore Road
Stirchley
Birmingham
B30 2 JL

Phone: 0121 433 3622
Fax: 0121 433 3601
Email: sales@recotherm.co.uk


When East Renfrewshire Council decided to replace their ageing heat pump swimming pool air handling unit, with a variable volume fresh air system in order to improve the internal conditions, the cost of a replacement unit was not the only consideration.

To handle the required air volume the minimum dimensions of the new unit were 2.97m long 1.6 wide and 2.3m high. Getting this unit into the building would involve removing part of the external wall or a section of the roof, two options that did not appeal to the Council. So when Recotherm advised that they could build the unit on-site to the same standard achieved in the factory, without having to undertake any of the suggested structural work to the building, the Council were delighted.

The project was completed within 3 weeks, the first week was used to remove the existing unit. The second was taken up installing the new unit after the ductwork had been modified to suit, the system was up and running at a fraction of the cost of the cost initially estimated.