Project: New Maldon Leisure Centre
Size of Pool 450 m2
Pool Volume 3780 m3
Pool water temperature 29 ªC
Pool hall Temperature 30 oC
Contractor Gratte Manley Ltd
Unit CVF 600
Air volume 6 m3/s
Maximum dehum 251 kg/h
Year of installation 2003
1437 Pershore Road
Stirchley
Birmingham
B30 2 JL
Phone: 0121 433 3622
Fax: 0121 433 3601
Email: sales@recotherm.co.uk

The council were not happy with the performance of the existing unit and were concern how much it was costing to service. Recotherm were asked if it would be possible to replace the existing unit without having to disturb the building structure. The original unit was cut up and removed from site, the new unit was brought on site in flat pack form and assembled in position. After slight modifications to the existing ductwork and pipework systems the unit was commissioned and set to work. The whole project was completed in two weeks.
The cost of servicing the unit has been reduced to £400.00 per annum.