recotherm

New Maldon Leisure Centre

The council were not happy with the performance of the existing unit and were concern how much it was costing to service. Recotherm were asked if it would be possible to replace the existing unit without having to disturb the building structure. The original unit was cut up and removed from site, the new unit was brought on site in flat pack form and assembled in position. After slight modifications to the existing ductwork and pipework systems the unit was commissioned and set to work. The whole project was completed in two weeks.

The cost of servicing the unit has been reduced to £400.00 per annum.

Project:
New Maldon Leisure Centre

Reason for Change:
N/A

Existing Unit:
N/A

Replacement Unit:
N/A

Pool

Size of Pool:
450 m²

Pool Volume:
3780 m³

Pool Water Temperature:
29 °C

Spa

Spa Volume:
N/A

Spa Temperature:
N/A

Pool Hall

Pool Hall Volume:
N/A

Pool Hall Temperature:
30 °C

Consultation

Consultant:
Gratte Manley Ltd

Unit:
CVF 600

Air Volume:
6 m3/s

Maximum Dehum:
251 kg/h

Date of Installation:
N/A

Programme of Works

Remove Old Unit:
N/A

Install New Unit:
N/A

Modify Ductwork:
N/A

Total Installation Time:
N/A

Copyright © Recotherm Limited 2011. All Rights Reserved

Recotherm ltd 1437 Pershore Rd, Stirchley, Birmingham. B30 2JL